![](https://www.ziglift.com/blog/wp-content/uploads/2023/11/image000001-scaled.jpg)
Trucks, Trailers, and Parts Distribution Center Project
LACEY, WA
Ziglift installed 1,120 pallet positions of selective pallet rack and wire decks, along with standard shelving and cantilever racking in a 26,328 sqft warehouse. This client is a leading full-service truck and trailer dealership headquartered in Portland, OR with over 30 locations.