{"id":5856,"date":"2026-07-14T23:04:01","date_gmt":"2026-07-14T23:04:01","guid":{"rendered":"https:\/\/www.ziglift.com\/blog\/?p=5856"},"modified":"2026-07-14T23:04:01","modified_gmt":"2026-07-14T23:04:01","slug":"%e2%9c%85-project-milestone-achieved","status":"publish","type":"post","link":"https:\/\/www.ziglift.com\/blog\/%e2%9c%85-project-milestone-achieved\/","title":{"rendered":"\u2705 Project Milestone Achieved!"},"content":{"rendered":"\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"E-Commerce Distribution Center\" width=\"580\" height=\"326\" src=\"https:\/\/www.youtube.com\/embed\/17Va7HeR62M?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p>Ziglift is proud to announce the successful completion of a full VNA system teardown at an E-Commerce Distribution Center in Santa Fe Springs, CA.<br><br>As part of the customer\u2019s expansion, the existing system is being relocated to a new nearby warehouse with an additional 20,000sq ft of VNA racking. In its place, we\u2019re installing a brand-new 25,000 sq ft, 4-level Pick Module system complete with integrated conveyors.<br><br>This new solution will deliver over 51,000 pick module bins, dramatically increasing picking efficiency and capacity for high-volume e-commerce operations.<br><br>Huge shoutout to our installation team \u2014 they\u2019re not only on track but currently ahead of schedule! \ud83d\udc4f<br><br>At Ziglift, we specialize in complex warehouse relocations, teardowns, and high-density storage &amp; picking solutions that help growing businesses scale smarter.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ziglift is proud to announce the successful completion of a full VNA system teardown at an E-Commerce Distribution Center in Santa Fe Springs, CA. As part of the customer\u2019s expansion, the existing system is being relocated to a new nearby warehouse with an additional 20,000sq ft of VNA racking. In its place, we\u2019re installing a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5857,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[49,52],"tags":[],"_links":{"self":[{"href":"https:\/\/www.ziglift.com\/blog\/wp-json\/wp\/v2\/posts\/5856"}],"collection":[{"href":"https:\/\/www.ziglift.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ziglift.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ziglift.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ziglift.com\/blog\/wp-json\/wp\/v2\/comments?post=5856"}],"version-history":[{"count":1,"href":"https:\/\/www.ziglift.com\/blog\/wp-json\/wp\/v2\/posts\/5856\/revisions"}],"predecessor-version":[{"id":5858,"href":"https:\/\/www.ziglift.com\/blog\/wp-json\/wp\/v2\/posts\/5856\/revisions\/5858"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ziglift.com\/blog\/wp-json\/wp\/v2\/media\/5857"}],"wp:attachment":[{"href":"https:\/\/www.ziglift.com\/blog\/wp-json\/wp\/v2\/media?parent=5856"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ziglift.com\/blog\/wp-json\/wp\/v2\/categories?post=5856"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ziglift.com\/blog\/wp-json\/wp\/v2\/tags?post=5856"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}